Shaffer Building Co. completed a $1.9M MRI suite build-out for Los Robles Regional Medical Center, working alongside HKS Architects to deliver a fully functional imaging environment within an active hospital campus. The scope required precise coordination across...
Los Robles – AHU 13
Los Robles Regional Medical Center
Shaffer Building Co. provided preconstruction & construction services for a $160,000 AHU 13 upgrade and blood lab constant air volume (CAV) replacement project at Los Robles Regional Medical Center, with WSP serving as the mechanical engineer of record. Shaffer’s scope included constructability review, estimating, and project scheduling, helping the owner and design team identify potential coordination conflicts and develop a realistic execution plan before committing to construction. The mechanical plan highlights the complexity of reworking HVAC distribution within occupied hospital spaces where air quality, pressure relationships, and temperature control are continuously regulated.
The project addressed aging air handling infrastructure and outdated CAV terminals serving the blood lab, where precise environmental controls are essential for specimen integrity and regulatory compliance. The before-and-after control panel photos illustrate the scope of the controls upgrade, replacing legacy pneumatic and analog components with updated wiring and instrumentation. Shaffer’s preconstruction involvement on this project reflects the firm’s expanding advisory role at Los Robles beyond traditional general contracting, drawing on our extensive healthcare background in HVAC equipment upgrades.
All Projects
Los Robles SPD
Shaffer Building Co. delivered a $958,000 Sterile Processing Department (SPD) sterilizer replacement and upgrade at Los Robles Regional Medical Center, designed by John Douglas Thomson. The project involved removing aging sterilization equipment and installing modern...
Los Robles Blood Lab
Shaffer Building Co. is providing preconstruction & construction services for a $1.3M blood lab renovation at Los Robles Regional Medical Center, designed by Haines & Oakley. The scope includes constructability review, estimating, and project scheduling for a...
Calistoga Resiliency Center
Shaffer Building Co. provided preconstruction and logistics services for the $15M Calistoga Resiliency Center, a utility-scale energy storage facility developed by Energy Vault and designed by Core States Energy. Shaffer's scope covered constructability review,...
Los Robles – MRI Preconstruction
Shaffer Building Co. is providing preconstruction services for a $1.2M remodel and upgrade of the existing MRI suite at Los Robles Regional Medical Center, designed by John Douglas Thomson. The scope includes constructability review, estimating, and project scheduling...





