Shaffer Building Co. is working on two separate projects as Design-Builder for the renovation of the Morgue & Materials Management areas in the basement of the Keck Hospital tower. The Morgue scope includes removal and replacement of the Morgue refrigerators to...
HCA Los Robles MRI Suite Build-out
Los Robles Regional Medical Center
Shaffer Building Co. completed a $1.9M MRI suite build-out for Los Robles Regional Medical Center, working alongside HKS Architects to deliver a fully functional imaging environment within an active hospital campus. The scope required precise coordination across structural, mechanical, and electrical trades to meet the stringent requirements of MRI installation, including RF shielding, vibration isolation, and reinforced flooring capable of supporting the equipment’s substantial weight. Delivery and rigging of the MRI unit itself demanded careful logistics planning given the facility’s operational & accessability constraints.
Shaffer self-performed all framing, drywall, and concrete work on the project, maintaining direct quality control over the critical envelope that forms the MRI suite’s shielded enclosure. The framing and insulation detailing visible during construction reflect the specialized wall assemblies required to prevent electromagnetic interference, while the below-floor mechanical rough-in accommodated the complex utility demands of modern imaging equipment. The project was completed in 2025 with the suite fully operational and integrated into the medical center’s diagnostic workflow.
All Projects
USC Keck Medicine Beach Cities Orthopedics Mods
Shaffer Building Co. was enlisted to complete $810,000 in modifications to Beach Cities Orthopedics after the USC purchase of the practice. Modifications included aesthetic improvements: flooring, painting & casework, as well as installation of nurse call devices...
USC Keck Medicine Pasadena MOB Licensing Mods & Misc. Tenant Improvements
Shaffer Building Co. completed $520,000 of post-occupancy modifications and tenant improvements at the new USC Keck Medicine Pasadena MOB, delivering the work required to secure licensing in an occupied medical office building. Within the 25,000 SF Ambulatory Surgical...
HCA Los Robles SPD Sterilizer Replacements
Shaffer Building Co. delivered a $958,000 Sterile Processing Department (SPD) sterilizer replacement and upgrade at Los Robles Regional Medical Center, designed by John Douglas Thomson. The project involved removing aging sterilization equipment and installing modern...
HCA Los Robles AHU 13 Upgrades & CAV Replacements
Shaffer Building Co. provided preconstruction & construction services for a $160,000 AHU 13 upgrade and blood lab constant air volume (CAV) replacement project at Los Robles Regional Medical Center, with WSP serving as the mechanical engineer of record. Shaffer's...
HCA Los Robles Blood Lab Equipment Replacements & Renovation
Shaffer Building Co. is providing preconstruction & construction services for a $1.3M blood lab renovation at Los Robles Regional Medical Center, designed by Haines & Oakley. The scope includes constructability review, estimating, and project scheduling for a...
Calistoga Resiliency Center
Shaffer Building Co. provided preconstruction and logistics services for the $15M Calistoga Resiliency Center, a utility-scale energy storage facility developed by Energy Vault and designed by Core States Energy. Shaffer's scope covered constructability review,...
HCA Los Robles MRI Preconstruction
Shaffer Building Co. is providing preconstruction services for a $1.2M remodel and upgrade of the existing MRI suite at Los Robles Regional Medical Center, designed by John Douglas Thomson. The scope includes constructability review, estimating, and project scheduling...








