Healthcare

HCA Los Robles SPD Sterilizer Replacements

Los Robles Regional Medical Center

Location
Thousand Oaks, CA
Architect / Design
John Thomson, Integrated Engineering, MHP Structural
Project Value
$1.1M - Design-Build
Status
Completed
Self-Perform
Demolition, Framing & Drywall, Concrete, ICRA & Equipment Seismic Anchorage
Services
General Contractor
Self-Perform

Shaffer Building Co. delivered a $958,000 Sterile Processing Department (SPD) sterilizer replacement and upgrade at Los Robles Regional Medical Center, designed by John Douglas Thomson. The project involved removing aging sterilization equipment and installing modern units while keeping the hospital’s critical instrument reprocessing capabilities operational throughout construction. Working within an active SPD required meticulous phasing and infection control protocols, as any disruption to sterilization workflows directly impacts surgical scheduling across the facility.

Shaffer self-performed the framing, drywall, and concrete work, while coordinating closely with mechanical and plumbing trades on the extensive utility infrastructure these units demand. The behind-the-wall photos show the density of steam, water, and drain piping required to support modern autoclave and washer-disinfector systems, along with upgraded ventilation to handle the heat loads and exhaust requirements. The finished installation delivered fully operational sterilization capacity with equipment that meets current regulatory standards for instrument reprocessing.

All Projects

USC Keck Medicine Morgue & Material Management Renovations

USC Keck Medicine Morgue & Material Management Renovations

Shaffer Building Co. is working on two separate projects as Design-Builder for the renovation of the Morgue & Materials Management areas in the basement of the Keck Hospital tower. The Morgue scope includes removal and replacement of the Morgue refrigerators to...

USC Keck Medicine Beach Cities Orthopedics Mods

USC Keck Medicine Beach Cities Orthopedics Mods

Shaffer Building Co. was enlisted to complete $810,000 in modifications to Beach Cities Orthopedics after the USC purchase of the practice. Modifications included aesthetic improvements: flooring, painting & casework, as well as installation of nurse call devices...

HCA Los Robles MRI Suite Build-out

HCA Los Robles MRI Suite Build-out

Shaffer Building Co. completed a $1.9M MRI suite build-out for Los Robles Regional Medical Center, working alongside HKS Architects to deliver a fully functional imaging environment within an active hospital campus. The scope required precise coordination across...

HCA Los Robles AHU 13 Upgrades & CAV Replacements

HCA Los Robles AHU 13 Upgrades & CAV Replacements

Shaffer Building Co. provided preconstruction & construction services for a $160,000 AHU 13 upgrade and blood lab constant air volume (CAV) replacement project at Los Robles Regional Medical Center, with WSP serving as the mechanical engineer of record. Shaffer's...

HCA Los Robles Blood Lab Equipment Replacements & Renovation

HCA Los Robles Blood Lab Equipment Replacements & Renovation

Shaffer Building Co. is providing preconstruction & construction services for a $1.3M blood lab renovation at Los Robles Regional Medical Center, designed by Haines & Oakley. The scope includes constructability review, estimating, and project scheduling for a...

Calistoga Resiliency Center

Calistoga Resiliency Center

Shaffer Building Co. provided preconstruction and logistics services for the $15M Calistoga Resiliency Center, a utility-scale energy storage facility developed by Energy Vault and designed by Core States Energy. Shaffer's scope covered constructability review,...

HCA Los Robles MRI Preconstruction

HCA Los Robles MRI Preconstruction

Shaffer Building Co. is providing preconstruction services for a $1.2M remodel and upgrade of the existing MRI suite at Los Robles Regional Medical Center, designed by John Douglas Thomson. The scope includes constructability review, estimating, and project scheduling...